How Long Does It Take to Build a WordPress Website? A Realistic Timeline
Intro
“How long will it take?” is usually the second question a client asks me, right after “how much will it cost?”
The honest answer is: it depends on what you are building and how ready your content is. But there are realistic ranges, and this guide gives them to you, phase by phase, so you can plan properly.
Some links here are affiliate links. If you buy through them, I may earn a commission at no extra cost to you.
Typical timelines
Published guides and my own experience agree roughly on these ranges:
- A simple site (5 to 8 pages, brochure style): 2 to 3 weeks
- A business site (10 to 20 pages, services, blog, contact forms): 5 to 6 weeks
- A WooCommerce shop (products, checkout, shipping, payments): 7 to 8 weeks
These are working weeks with a normal feedback loop, not calendar time stretched by long gaps. A project can take three months on the calendar and still only be three weeks of actual work, if feedback takes days each round.
Where the time actually goes
Phase 1: Discovery and planning (a few days to a week). This is the brief, the goals, the pages, and examples of sites you like. Skipping this phase is the fastest way to rebuild the site later.
Phase 2: Design (1 to 2 weeks). Homepage first, then inner pages. This is where most of the back and forth happens, and it should: changing a design is cheap, changing a built site is not.
Phase 3: Build (1 to 2 weeks). The approved design becomes a working site in WordPress, with the content added, the forms connected, and the mobile version tested.
Phase 4: Content and revisions (1 week, often more). Your text, your photos, your products. This is the phase that surprises people, because it depends on you, not the designer.
Phase 5: Testing and launch (a few days). Speed checks, form testing, links, backups, and going live. This includes setting up hosting with SSL if that is not done already. A host with one-click WordPress install and staging makes this phase much faster. If you are setting up hosting for the first time, I recommend Hostinger for budget shared hosting.
A realistic example: a 12-page business site, week by week
Week 1: I take the brief, plan the pages, and design the homepage. You review it and we agree the direction.
Week 2: I design the inner pages: services, about, contact, and blog. You review them in one round, not one page at a time.
Week 3: I build the site in WordPress and start adding your content as it arrives.
Week 4: The build finishes. Forms are tested, the mobile version is checked, and the speed is measured.
Week 5: Final revisions, a last check of every link, and launch.
That is five weeks with steady feedback. If each feedback round takes a week instead of two days, the same project takes eight weeks. The work did not grow. The gaps did.
How to estimate your own project
Count your pages first. A site with 6 pages is a 2 to 3 week job. A site with 15 pages and a blog is a 5 to 6 week job. A shop with 50 products is a 7 to 8 week job, and most of that extra time goes to products, not pages.
Then ask yourself two questions: is your content ready, and who approves the work? If the content is ready and one person decides, take the short end of the range. If the content is not written yet and three people need to approve, take the long end.
The number one delay: content not being ready
Ask any designer what delays projects most, and you will get the same answer: content.
The design can be approved in a week. The build can take two weeks. Then the project waits three weeks for the text and photos. This is normal, and it is also avoidable.
Before your project starts, prepare:
- Your text for every page, even as rough notes
- Your photos and logo files
- Your services, prices, and contact details
- Logins for your domain and hosting
A designer can polish rough text. A designer cannot invent your business details. The projects that finish on time are almost always the ones where the content was ready before the build started.
What speeds a project up
- One decision-maker. When three people approve every page, every round takes a week. One person deciding keeps the project moving.
- Prepared content, as above.
- Prompt feedback. A two-day turnaround on each round keeps a 5-week project at 5 weeks. A two-week turnaround turns it into a 10-week project.
- A clear brief at the start. Examples of sites you like save more time than any tool.
What slows a project down
- Adding pages halfway through the build
- Changing the design after it was approved and built
- Waiting on a third party, like a logo designer or a photographer
- A domain or hosting problem discovered at launch, not at the start
If you want to avoid the last one, sort out your domain and hosting in the first week, not the last.
The next step
If you have a deadline, tell me the date and what the site needs to do. I will tell you honestly whether the timeline works and what I need from you to hit it.
Get in touch or book a free 30-minute consultation. You can also read about my WordPress Website Design service.